Product Category
contact us
Weifang Chenxing Power Equipment Co., Ltd.
Address: No. 3177 Yuehe Road, Weifang Economic Development Zone, Shandong
Contact person: Manger Fu
Phone: +86 13205368911
Tel.: +86-536-6932111
What work needs to be done before the generator set starts
The preparation work before the start of the new diesel generator set should be done enough to make the generator set enter the work in a good state, so that the diesel generator set can exert its strength!
So, what should be done before starting the diesel generator set? The crew members will answer you about the work that needs to be done before the diesel generator set starts...
To check whether the oil level of the oil pan is suitable, check the amount of oil in the fuel tank. Secondly, turn on the fuel tank switch to make diesel flow to the fuel injection pump. Exhaust the air in the fuel system and cooling system, and at the same time, add lubricating oil to the fuel injection pump and the supercharger. Check whether the battery is fully charged, connect the battery to the circuit, and check that the circuit is energized.
- Previous Article: The working principle of Weifang diesel generator set
- Next Article: Problems Easily Neglected in Diesel Engine Maintenance