国产三级片精品视频_亚洲欧美日韩一区二区在线电影_(愛妃)国产亚洲精品a在线观看_免费强 角色乳液网站下载_西西人体大胆牲交视频_免费无遮挡十八禁污污污网站_999a片免费视频网站_国产亚洲tv在线观看_日韩av无码专区国产乱码互动交流_高清亚洲无套AV

Welcome to the website of Weifang Chenxing Power Equipment Co., Ltd.! Consultation service Tel. : +86-536-6932111 +86-13205368911

Your location: Home ? Technology Center

contact us

Weifang Chenxing Power Equipment Co., Ltd. Address: No. 3177 Yuehe Road, Weifang Economic Development Zone, Shandong
Contact person: Manger Fu
Phone: +86 13205368911
Tel.: +86-536-6932111

Technology Center

What work needs to be done before the generator set starts

Date: 2018-07-16 10:58:42 Click:

The preparation work before the start of the new diesel generator set should be done enough to make the generator set enter the work in a good state, so that the diesel generator set can exert its strength!

So, what should be done before starting the diesel generator set? The crew members will answer you about the work that needs to be done before the diesel generator set starts...

To check whether the oil level of the oil pan is suitable, check the amount of oil in the fuel tank. Secondly, turn on the fuel tank switch to make diesel flow to the fuel injection pump. Exhaust the air in the fuel system and cooling system, and at the same time, add lubricating oil to the fuel injection pump and the supercharger. Check whether the battery is fully charged, connect the battery to the circuit, and check that the circuit is energized.