Five points that should be paid attention to when maintaining diesel generator sets 2020-09-07 14:10:18
Diesel generator sets, especially emergency backup generator sets, should be operated at least every two weeks, with an operating time of 15 to 20 minutes. It is re...
-
Ten steps for commissioning of generator sets 2019-09-24 15:39:30
First turn off the drain valve, add clean drinking water or purified water to the position of the water tank mouth, and close the water tank cover. Antifreeze shoul...
-
How to Fill Weifang Weichai Diesel Engine with Coolant 2018-07-16 11:01:15
Do you know how to fill Weifang Weichai diesel engine with coolant? Let's introduce it for everyone.
-
The main points of choosing Weifang Weichai diesel engine 2018-07-16 11:00:49
When choosing a Weifang Weichai diesel engine, you should try to consider the main factors such as mechanical and electrical performance, the use of the unit, the c...
-
Method for installing the body of Weifang diesel generator set 2018-07-16 11:00:26
Before we install the Weifang diesel generator set, we need to check and accept the unit and the installation foundation, and then we can start the installation of ...
-
How to solve the problem of Weifang Weichai diesel engine cylinder liner wear 2018-07-16 10:59:52
The cylinder liner wear of Weifang Weichai diesel engine can be divided into three situations, namely abrasive wear, fusion wear and corrosion wear. Therefore, to s...
-
Measures to protect the finished products of Weifang diesel generator set accessories 2018-07-16 10:59:25
fter the Weifang diesel generator set accessories are installed, we need to take measures to protect the finished product.
-
Problems Easily Neglected in Diesel Engine Maintenance 2018-07-16 10:59:00
Only replace the plunger and nozzle, ignoring the technical status of the delivery valve. After the fuel delivery valve is worn, the remaining pressure of the high-...
-
What work needs to be done before the generator set starts 2018-07-16 10:58:42
The preparation work before the start of the new diesel generator set should be done enough to make the generator set enter the work in a good state, so that the di...
-
The working principle of Weifang diesel generator set 2018-07-16 10:58:20
Weifang diesel generator set is a kind of small power generation equipment, which uses diesel as fuel and diesel engine as prime mover to drive generator to generate electricity.